No. Seller Buyer Traded Instrument Contract no./ Signed contract date Cancelled period
(start date - end date)
Cancel date Cancel reason Participant that cancelled
the contract
Publishing date
58 S.C. ENERGY CORE DEVELOPMENT S.R.L. S.C. EGGER ROMANIA S.R.L. FWB-TR-2-22 ECD020/17.08.2021 08.04.2022 - 30.06.2022 08.04.2022 S.C. ENERGY CORE DEVELOPMENT S.R.L. failed to comply with the contractual obligation as in according to art. 18 letter b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letter d) S.C. EGGER ROMANIA S.R.L. 08.04.2022
57 S.C. NEXT ENERGY PARTNERS S.R.L. S.C. EFT FURNIZARE S.R.L. FWB-A-2022 NE20V010/22.07.2020** 05.01.2022 - 31.12.2022 05.01.2022 The violation by S.C. NEXT ENERGY PARTNERS S.R.L. of the provisions of art. 17, 18 letter b), 21, 26 and the rest of the dispositions from both the Contract and the New Civil Code S.C. EFT FURNIZARE S.R.L. 06.01.2022
56 S.C. ELECTRIC PLANNERS S.R.L. S.C. EFT FURNIZARE S.R.L. FWB-A-2022 040221/24.02.2021 01.01.2022 - 31.12.2022 27.12.2021 Mutual agreement S.C. ELECTRIC PLANNERS S.R.L. S.C. EFT FURNIZARE S.R.L. 05.01.2022
55 S.C. NEXT ENERGY PARTNERS S.R.L. S.C. EFT FURNIZARE S.R.L. FWB-A-2022 NE20V010/22.07.2020** 01.01.2022 - 31.12.2022 30.12.2021 S.C. EFT FURNIZARE S.R.L. failed to comply with the provision of the contract's art. 20 letter b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letter d) and art. 28 S.C. NEXT ENERGY PARTNERS S.R.L. 31.12.2021
53 S.C. ELECTRIC PLANNERS S.R.L. S.C. CEZ VANZARE S.A. FWB-A-2022 050221/24.02.2021 01.01.2022 - 31.12.2022 15.12.2021 Mutual agreement S.C. ELECTRIC PLANNERS S.R.L.
S.C. CEZ VANZARE S.A.
17.12.2021
52 S.C. WERK ENERGY S.R.L. S.C. ELECTRICA FURNIZARE S.A. FWB-A-2022 WO 36-02/24.02.2021 01.01.2022 - 31.12.2022 27.12.2021 Unilateral denunciation based on art. 123 paragraph (1) and paragraph (2) of the Law no. 85/2014 on insolvency prevention and insolvency proceedings S.C. WERK ENERGY S.R.L. 13.12.2021
51 S.C. WERK ENERGY S.R.L. S.C. EFT FURNIZARE S.R.L. FWB-A-2022 WO 45-02/09.03.2021 01.01.2022 - 31.12.2022 27.12.2021 Unilateral denunciation based on art. 123 paragraph (1) letter b) of the Law no. 85/2014 on insolvency prevention and insolvency proceedings S.C. WERK ENERGY S.R.L. 06.12.2021
50 S.C. WERK ENERGY S.R.L. S.C. EFT FURNIZARE S.R.L. FWB-TR-1-22 WO 42-03/04.03.2021 01.01.2022-31.03.2022 27.12.2021 Unilateral denunciation based on art. 123 paragraph (1) letter b) of the Law no. 85/2014 on insolvency prevention and insolvency proceedings S.C. WERK ENERGY S.R.L. 06.12.2021
49 S.C. ELECTRIC PLANNERS S.R.L. S.C. DELGAZ GRID S.A. FWB-A-2021 010220/06.02.2020 05.11.2021-31.12.2021 05.11.2021 S.C. ELECTRIC PLANNERS S.R.L. failed to comply with the contractual obligation as in according to art. 18 letter b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letter d) S.C. DELGAZ GRID S.A. 10.11.2021
48 S.C. WERK ENERGY S.R.L. S.C. MONSSON TRADING S.R.L. FWB-TR-1-22 WO 41-04/03.03.2021 01.01.2022-31.03.2022 27.12.2021 Unilateral denunciation based on art. 123 paragraph (1) letter b) of the Law no. 85/2014 on insolvency prevention and insolvency proceedings S.C. WERK ENERGY S.R.L. 08.11.2021
47 S.C. WERK ENERGY S.R.L. S.C. ELECTRICA FURNIZARE S.A. FWB-TR-4-21 WO 101-02/02.06.2021 01.10.2021-31.12.2021 29.09.2021 Unilateral denunciation based on art. 123 paragraph (1) and paragraph (2) of the Law no. 85/2014 on insolvency prevention and insolvency proceedings S.C. WERK ENERGY S.R.L. 05.11.2021
46 S.C. ELECTRIC PLANNERS S.R.L. S.C. E.ON ENERGIE ROMANIA S.A. FWB-A-2021 041120/27.11.2020 28.10.2021-31.12.2021 28.10.2021 S.C. ELECTRIC PLANNERS S.R.L. failed to comply with the contractual obligation as in according to art. 18 letter b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letter d) S.C. E.ON ENERGIE ROMANIA S.A. 01.11.2021
45 S.C. NEXT ENERGY PARTNERS S.R.L. S.C. LJG GREEN SOURCE ENERGY GAMMA S.R.L. FWB-A-2021 NE20V018/20.10.2020 01.11.2021-31.12.2021 29.10.2021 Mutual agreement S.C. NEXT ENERGY PARTNERS S.R.L.
S.C. LJG GREEN SOURCE ENERGY GAMMA S.R.L.
29.10.2021
44 S.C. ELECTRIC PLANNERS S.R.L. S.C. DISTRIBUTIE ENERGIE ELECTRICA ROMANIA S.A. FWB-A-2021 030121/03.02.2020 15.10.2021-31.12.2021 15.10.2021 S.C. ELECTRIC PLANNERS S.R.L. failed to comply with the contractual obligation as in art. 26, paragraph (1), letter (c), respectively not submitting the notifications on the balancing market platform for the transactions related to this contract for 3 consecutive days. S.C. DISTRIBUTIE ENERGIE ELECTRICA ROMANIA S.A. 19.10.2021
43 S.C. C.E.T. ARAD S.A. S.C. AXPO ENERGY ROMANIA S.A. FWB-SEM-2-21 203.377/23.03.2021 01.10.2021-31.12.2021 01.10.2021 Cancelation according to Art. 26 paragraph (1), letter (c) and (d) : failure to comply with the obligation of energy delivery according to the Art. 18 let (b) and the obligation of submitting the notifications on the balancing market platform according Art. 8.1 S.C. AXPO ENERGY ROMANIA S.A. 11.10.2021
42 S.C. C.E.T. ARAD S.A. S.C. AXPO ENERGY ROMANIA S.A. FWB-SEM-2-21 203.373/16.02.2021 01.10.2021-31.12.2021 01.10.2021 Cancelation according to Art. 26 paragraph (1), letter (c) and (d) : failure to comply with the obligation of energy delivery according to the Art. 18 let (b) and the obligation of submitting the notifications on the balancing market platform according Art. 8.1 S.C. AXPO ENERGY ROMANIA S.A. 11.10.2021
41 S.C. C.E.T. ARAD S.A. S.C. AXPO ENERGY ROMANIA S.A. FWB-TR-4-21 203.378/23.03.2021 01.10.2021-31.12.2021 01.10.2021 Cancelation according to Art. 26 paragraph (1), letter (c) and (d) : failure to comply with the obligation of sending the letters of bank guarantee according to the provisions of Art. 18 let (e) and Art. 17 paragraph 5 ; with the obligation of energy delivery according to the Art. 18 let (b) and the obligation of submitting the notifications on the balancing market platform according Art. 8.1 S.C. AXPO ENERGY ROMANIA S.A. 11.10.2021
40 S.C. C.E.T. ARAD S.A. S.C. AXPO ENERGY ROMANIA S.A. FWB-TR-4-21 203.375/26.02.2021 01.10.2021-31.12.2021 01.10.2021 Cancelation according to Art. 26 paragraph (1), letter (c) and (d) : failure to comply with the obligation of sending the letters of bank guarantee according to the provisions of Art. 18 let (e) and Art. 17 paragraph 5 ; with the obligation of energy delivery according to the Art. 18 let (b) and the obligation of submitting the notifications on the balancing market platform according Art. 8.1 S.C. AXPO ENERGY ROMANIA S.A. 11.10.2021
39 S.C. ALIVE CAPITAL S.A. S.C. PLENERG S.R.L. FWB-A-2021 241/17.11.2020 01.10.2021-31.12.2021 01.10.2021 The impossibility of the seller to fulfill his contractual obligation mentioned at art. 18 lit (b) S.C. PLENERG S.R.L. 08.10.2021
38 S.C. WERK ENERGY S.R.L. S.C. MONSSON TRADING S.R.L. FWB-TR-4-21 WO 41-03/03.03.2021 01.10.2021-31.12.2021 29.09.2021 Unilateral denunciation based on art. 123 paragraph (1) letter b) of the Law no. 85/2014 on insolvency prevention and insolvency proceedings S.C. WERK ENERGY S.R.L. 08.10.2021
37 S.C. NEXT ENERGY PARTNERS S.R.L. S.C. E-DISTRIBUTIE DOBROGEA S.A. FWV1-A-2021 NE20V008/05.06.2020 07.10.2021-31.12.2021 07.10.2021 S.C. NEXT ENERGY PARTNERS S.R.L. failed to comply with the contractual obligation provided by art. 18, letter (b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letters (c) S.C. E-DISTRIBUTIE DOBROGEA S.A. 06.10.2021
36 S.C. NEXT ENERGY PARTNERS S.R.L. S.C. E-DISTRIBUTIE MUNTENIA S.A. FWV1-A-2021 NE20V007/04.06.2020 07.10.2021-31.12.2021 07.10.2021 S.C. NEXT ENERGY PARTNERS S.R.L. failed to comply with the contractual obligation provided by art. 18, letter (b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letters (c) S.C. E-DISTRIBUTIE MUNTENIA S.A. 06.10.2021
35 S.C. SUN WAVE ENERGY S.R.L. S.C. TINMAR ENERGY S.A. FWB-TR-4-21 84/01.04.2021 04.10.2021-31.12.2021 04.10.2021 The violation by S.C. SUN WAVE ENERGY S.R.L. of the contractual obligations provided by art. 17 and art. 18, letter (b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letters (c) and (d), paragraphs (2) and (4) from the contract. S.C. TINMAR ENERGY S.A. 05.10.2021
34 S.C. VEST-ENERGO S.A. S.C. SUN WAVE ENERGY S.R.L. FWB-SEM-2-21 88/20.04.2021 06.09.2021-31.12.2021 06.09.2021 Mutual agreement S.C. VEST-ENERGO S.A.
S.C. SUN WAVE ENERGY S.R.L.
01.09.2021
33 S.C. ELECTRIC PLANNERS S.R.L. S.C. TINMAR ENERGY S.A. FWB-SEM-2-21 100321/31.03.2021 23.08.2021-31.12.2021 23.08.2021 The violation by S.C. ELECTRIC PLANNERS S.R.L. of the provisions of art. 18 letter (b) with the consequence of applying the provisions provided by art. 26, paragraph (1), letters (c) and (d), paragraph (2) and paragraph (4) from the contract. S.C. TINMAR ENERGY S.A. 24.08.2021
32 S.C. DATA FINANCE GROUP S.R.L. S.C. ALIVE CAPITAL S.A. FWB-TR-4-21 070621/28.06.2021 01.10.2021-31.12.2021 13.08.2021 Mutual agreement S.C. DATA FINANCE GROUP S.R.L.
S.C. ALIVE CAPITAL S.A.
18.08.2021
31 S.C. DATA FINANCE GROUP S.R.L. S.C. ALIVE CAPITAL S.A. FWB-L-Sep-21 060621/28.06.2021 01.09.2021-30.09.2021 13.08.2021 Mutual agreement S.C. DATA FINANCE GROUP S.R.L.
S.C. ALIVE CAPITAL S.A.
18.08.2021
30 S.C. DATA FINANCE GROUP S.R.L. S.C. ALIVE CAPITAL S.A. FWB-L-Aug-21 050621/28.06.2021 13.08.2021-31.08.2021 13.08.2021 Mutual agreement S.C. DATA FINANCE GROUP S.R.L.
S.C. ALIVE CAPITAL S.A.
18.08.2021
29 S.C. ELECTRIC PLANNERS S.R.L. S.C. CEZ VANZARE S.A. FWB-SEM-2-21 010521/04.05.2021 16.08.2021-31.12.2021 16.08.2021 S.C. ELECTRIC PLANNERS S.R.L. failed to comply with the contractual obligation as in art. 26, paragraph (1), letter (c), respectively not submitting the notifications on the balancing market platform for the transactions related to this contract for 3 consecutive days. S.C. CEZ VANZARE S.A. 17.08.2021
28 S.C. ELECTRIC PLANNERS S.R.L. S.C. MONSSON TRADING S.R.L. FWB-SEM-2-21 40321/09.03.2021 01.08.2021-31.12.2021 20.07.2021 Mutual agreement S.C. ELECTRIC PLANNERS S.R.L.
S.C. MONSSON TRADING S.R.L.
26.07.2021
27 S.C. MONSSON TRADING S.R.L. S.C. ELECTRIC PLANNERS S.R.L. FWV1-A-2021 184.20/09.11.2020 01.08.2021-31.12.2021 20.07.2021 Mutual agreement S.C. MONSSON TRADING S.R.L.
S.C. ELECTRIC PLANNERS S.R.L.
26.07.2021
26 S.C. WERK ENERGY S.R.L. S.C. TINMAR ENERGY S.A. FWB-TR-3-21 WO 83-01/05.05.2021 01.07.2021-30.09.2021 01.07.2021 S.C. WERK ENERGY S.R.L. failed to comply with the obligation of energy delivery as in the concluded contract S.C. TINMAR ENERGY S.A. 02.07.2021
25 S.C. WERK ENERGY S.R.L. S.C. TINMAR ENERGY S.A. FWB-TR-3-21 WO 79-03/28.04.2021 01.07.2021-30.09.2021 01.07.2021 S.C. WERK ENERGY S.R.L. failed to comply with the obligation of energy delivery as in the concluded contract S.C. TINMAR ENERGY S.A. 02.07.2021
24 S.C. WERK ENERGY S.R.L. S.C. TINMAR ENERGY S.A. FWB-TR-3-21 WO 71-03/16.04.2021 01.07.2021-30.09.2021 01.07.2021 S.C. WERK ENERGY S.R.L. failed to comply with the obligation of energy delivery as in the concluded contract S.C. TINMAR ENERGY S.A. 02.07.2021
23 S.C. SUN WAVE ENERGY S.R.L. S.C. TINMAR ENERGY S.A. FWB-TR-3-21 87/16.04.2021 01.07.2021-30.09.2021 01.07.2021 S.C. SUN WAVE ENERGY S.R.L. failed to comply with the contractual obligation as in art. 26, paragraph (1), letter (d) S.C. TINMAR ENERGY S.A. 02.07.2021
22 S.C. SUN WAVE ENERGY S.R.L. S.C. TINMAR ENERGY S.A. FWB-SEM-2-21 83/31.03.2021 01.07.2021-31-12-2021 01.07.2021 S.C. SUN WAVE ENERGY S.R.L. failed to comply with the contractual obligation as in art. 26, paragraph (1), letter (d) S.C. TINMAR ENERGY S.A. 02.07.2021
21 S.C. MONSSON TRADING S.R.L. S.C. CEZ VANZARE S.A. FWB-A-2021 182.20/04.11.2020 01.07.2021-31.12.2021 01.07.2021 Mutual agreement S.C. MONSSON TRADING S.R.L.
S.C. CEZ VANZARE S.A.
01.07.2021
20 S.C. MONSSON TRADING S.R.L. S.C. CEZ VANZARE S.A. FWB-A-2021 177.20/29.10.2020 01.07.2021-31.12.2021 01.07.2021 Mutual agreement S.C. MONSSON TRADING S.R.L.
S.C. CEZ VANZARE S.A.
01.07.2021
19 S.C. WERK ENERGY S.R.L. S.C. ELECTRICA FURNIZARE S.A. FWB-TR-2-21 WO 07-03/12.01.2021 25.06.2021-30.06.2021 25.06.2021 S.C. WERK ENERGY S.R.L. failed to comply with the provision of the contract's art. 18 letter b) S.C. ELECTRICA FURNIZARE S.A. 28.06.2021
18 S.C. WERK ENERGY S.R.L. S.C. ENEL ENERGIE S.A. FWB-TR-2-21 WO 08-02/13.01.2021 27.06.2021-30.06.2021 26.06.2021 S.C. WERK ENERGY S.R.L. failed to comply with the provision of the contract's art. 18 letter b) and art. 26, paragraph (1), letter (c) S.C. ENEL ENERGIE S.A. 28.06.2021
17 S.C. ENERGY REPUBLIC TRADING S.R.L. S.C. GREEN VISION SEVEN S.R.L. FWB-A-2021 ERTE009/10.11.2020 28.04.2021-31.12.2021 28.04.2021 S.C. ENERGY REPUBLIC TRADING S.R.L. failed to comply with the obligation to deliver the energy according to art. 3 and art. 18 letter (b) from the standard contract S.C. GREEN VISION SEVEN S.R.L. 28.04.2021
16 S.C. VERONIKI WIND S.R.L. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-L-Feb-21 480/11.11.2020 01.02.2021-28.02.2021 29.01.2021 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the obligation to submit the letter of bank guarantee according to art. 26, paragraph (1), letter (d) and art. 16 from the standard contract S.C. VERONIKI WIND S.R.L. 29.01.2021
15 S.C. WERK ENERGY S.R.L. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-TR-1-21 WO 115-01/24.06.2020 01.01.2021-31.03.2021 30.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the obligation to submit the letter of bank guarantee according to art. 26, paragraph (1), letter (d) and art. 16 from the standard contract S.C. WERK ENERGY S.R.L. 31.12.2020
14 S.C. WERK ENERGY S.R.L. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-TR-1-21 WO 105-03/10.06.2020 01.01.2021-31.03.2021 30.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the obligation to submit the letter of bank guarantee according to art. 26, paragraph (1), letter (d) and art. 16 from the standard contract S.C. WERK ENERGY S.R.L. 31.12.2020
13 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI S.C. GREEN VISION SEVEN S.R.L. FWB-TR-1-21 AIKEN41/04.11.2020 01.01.2021-31.03.2021 30.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the obligation to submit the letter of bank guarantee according to art. 17 paragraph 1 and 5 reported to art. 18 letter e) from the standard contract S.C. GREEN VISION SEVEN S.R.L. 30.12.2020
12 S.C. ICCO ENERG S.R.L. S.C. GREEN VISION SEVEN S.R.L. FWB-L-Dec-20 984/06.11.2020 01.12.2020-31.12.2020 27.11.2020 Mutual agreement S.C. ICCO ENERG S.R.L.
S.C. GREEN VISION SEVEN S.R.L.
30.12.2020
11 S.C. HIDROELECTRICA S.A. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-TR-1-21 951/28.10.2020 01.01.2021-31.03.2021 30.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the provision of the contract's art. 10 paragraph 2 in conjunction with art. 26, paragraph (1), letter (d) S.C. HIDROELECTRICA S.A. 30.12.2020
10 S.C. HIDROELECTRICA S.A. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-TR-1-21 976/30.10.2020 01.01.2021-31.03.2021 30.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the provision of the contract's art. 10 paragraph 2 in conjunction with art. 26, paragraph (1), letter (d) S.C. HIDROELECTRICA S.A. 30.12.2020
9 S.C. HIDROELECTRICA S.A. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-TR-1-21 951/28.10.2020 01.01.2021-31.03.2021 30.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the provision of the contract's art. 10 paragraph 2 in conjunction with art. 26, paragraph (1), letter (d) S.C. HIDROELECTRICA S.A. 30.12.2020
8 S.C. VERONIKI WIND S.R.L. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-L-Jan-21 479/11.11.2020 01.01.2021-31.01.2021 28.12.2020 Mutual agreement S.C. VERONIKI WIND S.R.L.
AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI
28.12.2020
7 SOCIETATEA COMPLEXUL ENERGETIC OLTENIA S.A. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-SEM-2-20 894/CEO/07.05.2020 18.11.2020-31.12.2020 03.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the payment obligation SOCIETATEA COMPLEXUL ENERGETIC OLTENIA S.A. 22.12.2020
6 SOCIETATEA COMPLEXUL ENERGETIC OLTENIA S.A. AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI FWB-TR-4-20 881/CEO/05.05.2020 18.11.2020-31.12.2020 03.12.2020 AIK ENERGY LTD LONDRA SUCURSALA BUCURESTI failed to comply with the payment obligation SOCIETATEA COMPLEXUL ENERGETIC OLTENIA S.A. 22.12.2020
5 S.C. E.ON ENERGIE ROMANIA S.A. S.C. RES ENERGY SOLUTIONS S.A. FWB-TR-2-20 400/27.02.2020 01.04.2020 - 30.06.2020 01.04.2020 S.C. RES ENERGY SOLUTIONS S.A. failed to comply with the obligation to submit the letter of bank guarantee according to art. 16 paragraph 1 and art. 20 letter b) from the standard contract S.C. E.ON ENERGIE ROMANIA S.A. 29.04.2020
4 S.C. TINMAR ENERGY S.A. S.C. RES ENERGY SOLUTIONS S.A. FWB-L-Apr-20 1946/28.02.2020 01.04.2020 - 30.04.2020 01.04.2020 S.C. RES ENERGY SOLUTIONS S.A. failed to comply with the obligation to submit the letter of bank guarantee according to art. 16 paragraph 1 and art. 20 letter b) from the standard contract S.C. TINMAR ENERGY S.A. 14.04.2020
3 S.C. HIDROELECTRICA S.A. S.C. WATT PLUS S.A. FWB-TR-2-20 296/04.03.2020 01.04.2020 - 30.06.2020 31.03.2020 S.C. WATT PLUS S.A failed to comply with the provision of the contract’s art. 26, paragraph (1), letter (d) S.C. HIDROELECTRICA S.A. 01.04.2020
2 S.C. WATT PLUS S.A. SOCIETATEA DE DISTRIBUTIE A ENERGIEI ELECTRICE TRANSILVANIA NORD S.A. FWB-TR-2-20 94/31.01.2020 01.04.2020 - 30.06.2020 31.03.2020 Mutual agreement S.C. WATT PLUS S.A.
SOCIETATEA DE DISTRIBUTIE A ENERGIEI ELECTRICE TRANSILVANIA NORD S.A.
31.03.2020
1 S.C. GENERAL ENERGETIC S.A. S.C. MET ROMANIA ENERGY S.A. FWB-L-Feb-20 3468/13.12.2019 01.02.2020 - 29.02.2020 29.01.2020 Mutual agreement
S.C. GENERAL ENERGETIC S.A. 
S.C. MET ROMANIA ENERGY S.A.
17.03.2020

** This contract has been notified by both parties as being terminated.

*The contracts notified to OPCOM that have ceased by mutual agreement are subject to the provisions of Art. 20 of the Regulation regarding the modalities to conclude the electricity bilateral contracts by means of Extended Auctions Mechanism and Continuous Negotiation Mechanism and by means of processing contracts, approved by ANRE Order no. 78/ 14.08.2014 including subsequent amendments and additions and according to the clarifications received by OPCOM in ANRE document no. 19941/ 03.02.2020.

Also, the termination of contracts based on art. 123 paragraph (1) letter b) of the Law no. 85/2014 on insolvency prevention and insolvency procedures is subject to the provisions of Art. 20 of the Regulation regarding the modalities to conclude the electricity bilateral contracts by means of Extended Auctions Mechanism and Continuous Negotiation Mechanism and by means of processing contracts, approved by ANRE Order no. 78/ 14.08.2014 including subsequent amendments and additions.